Close 1" · Normal 1" · Loose 1" — nominal + 1/64" / 1/32" / 1/16" to the nearest standard drill (common shop practice).
Hex head (across flats)
1-11/16"
Close 1" · Normal 1" · Loose 1" — nominal + 1/64" / 1/32" / 1/16" to the nearest standard drill (common shop practice).
Tightening torque estimate
Target preload is 75% of proof load; torque is estimated from T = K · F · d.
Grade / class
Stress area
Preload
Torque
SAE Grade 2
0.7633 in²
31485 lbf
590 lb·ft · 7084 lb·in
SAE Grade 5
0.7633 in²
48659 lbf
912 lb·ft · 10948 lb·in
SAE Grade 8
0.7633 in²
68695 lbf
1288 lb·ft · 15456 lb·in
These figures assume a nut factor of K = 0.20 (dry / as-received steel). K captures thread and head friction and can swing torque by 30% or more — a lubricated joint needs noticeably less. Change the lubrication assumption in the bolt-torque calculator.
What tap drill do I need for 1-1/8-7 UNC?
For a 1-1/8-7 UNC thread, drill the hole with a 63/64" tap drill (25 mm) before tapping. That produces roughly 76% thread engagement, the usual target for a strong, tappable hole. The mating bolt has a major diameter of 28.575 mm and a pitch of 3.629 mm (7 TPI).
To pass a 1-1/8-7 UNC bolt through a part rather than thread it, use a clearance hole: Close 1" · Normal 1" · Loose 1" — nominal + 1/64" / 1/32" / 1/16" to the nearest standard drill (common shop practice)..
All values are generated from the standard thread formulas (ISO 68-1 / ASME B1.1) and published standard tables — not hand-entered. See the full reference.